Do I need to change the manufacturing temperature of the asphalt mixes?2020-07-20T15:31:55+02:00

The mix manufacturing temperature should be between 165 and 185°C according to the change in the mix.

Do I need to change the mixing time?2022-05-13T11:32:29+02:00

No, it is not necessary, the mixing time of all our products remains the same except for RW Color for which you will add 10 to 30 seconds.

How much quantity of pellets do I need?2022-05-13T11:33:47+02:00

We prescribe the dosage according to the required performance.  A study in your or our laboratory can be carried out to determine the optimal dosage.

Do I need to contact a distributor?2020-07-20T15:35:23+02:00

We sell in all parts of the world. You can contact us directly and we will direct you to our local agent or distributor.